Services -- Construction Management -- Construction Management Process

The Construction Management Process

 


Pre-Design Phase

Our pre-construction team will spearhead all design services including:

  • Program Planning
  • Conceptualizing
  • Project Planning

Avoid Surprises via Early "Constructability" Assessments
Brookstone Builders, Inc. will work with your team, including your Architect/Engineer, to evaluate all design criteria, and analyze the "constructability" of options before final drawings are prepared.

Cost Management and Planning Services
By assigning one of our highly skilled Project Managers (trained in business management as well as an extensive construction background) at the earliest phase of your project, we can provide the team with experience and knowledge in the areas of estimating, scheduling, documentation, code compliance, cost savings, and most importantly, a satisfied client.

Brookstone Builders' pre-construction services represent the first step towards a cost effective, high quality, on-time building solution.

Top of page

Design to Bid and Award Phase

Our focused pre-construction team will help you to take advantage of opportunities to impact quality, safety, performance, cost, and scheduling. During this "design development" phase we will provide:

  • Regularly updated construction estimates to determine a Guaranteed Maximum Price (GMP).
  • Preliminary schedule updates and the development of trade work schedules.
  • Consultation with architect/engineer.
  • Pre-purchasing and early procurement services.
  • The development of work bid packages.
  • Integration of the construction team into design development.
  • Preparation of a sound construction logistics plan.
  • Coordination of early site/construction activities with final design development.

Challenging Assumptions and Professionally Exchanging Ideas to Ensure Efficiency
As your project evolves from the overall concepts phase to the final drawings and specifications stage, the key to success will be the generation of accurate and timely information by the construction manager.

Brookstone Builders, Inc. offers extensive pre-construction and construction experience, and will put this expertise to use by proactively investigating every opportunity for project-efficiency and improvement, and by providing a formal list of cost to value-added solutions.

Once design is completed, we will update our quantity analysis and pricing, qualify pre-screened suppliers and sub-contractors, and assemble a Guaranteed Maximum Price.

Effective Planning and Value
Supplying qualified labor and quality materials at competitive prices requires a thorough procurement strategy, which we will also develop during pre-construction. With your approval, Brookstone Builders, Inc. will negotiate final prices with approved trades-people and vendors, and will issue the necessary documents to establish contractual agreements. All unit pricing, alternates, schedule milestones, quality control procedures, applicable wage scales, and safety regulations pertinent to the scope-of-work will be contained in these documents.

Top of page

Construction Phase - Total Quality Management

Brookstone Builders, Inc. will make available a fully functional field staff, capable of making accurate logistic decisions and of providing complete support services, including:

  • Project Activity Control
  • Scheduling & Purchasing
  • Documentation Control
  • Project Cost Control

Diligent Monitoring and Regular Communication Yield Maximum Efficiency
The Project Manager will prepare daily reports indicating the number of workers on site, activities, quality of work, and any noted deficiencies. Our on-site Project Manager will meet with the Superintendent each day to discuss this report and to exchange information on all pertinent project issues.

Weekly progress meetings will be conducted with representatives from the Owner, Architect/Engineer, Brookstone Builders, Inc., major tradesmen, and suppliers in attendance. The Project Manager will produce meeting minutes and distribute them to the team within 48 hours of the team meeting. Our on-site project staff will also conduct weekly staff meetings to coordinate activities and to implement directives outlined at the team meeting.

Scheduling for Success
The Project Manager and the Superintendent will be active in monitoring, updating, and maintaining schedules, as well as determining and reacting to schedule trends that might affect the completion date. These schedules will include outstanding design issues, purchasing activity, vendor drawings/submittals/approvals, material fabrication and deliveries, construction activities, and start-up activities.

Brookstone Builders, Inc. will not only develop the construction schedule, but will also interface the master procurement schedule with the construction schedule, develop a purchasing schedule matrix for your project, and generate bar charts, printouts, and logic diagrams as required.

We will also update the integrated design/procurement/construction schedule on a bi-weekly basis.

Documentation Kept Simple Keeps Your Project Moving Forward
The project team will coordinate shop drawings and submittal processes, and a "pending submittal list" will be reported at each weekly progress meeting.

Brookstone Builders, Inc. will also maintain a Request for Information (RFI) log, which will catalog and cross-reference all information requests, and will coordinate as necessary between the A/E, tradesmen, and suppliers; in addition, we will review and compare all shop drawings to project drawings and specifications prior to their submittal to the Architect/Engineer to ensure a faster approval process.

  • Submittals will be reviewed for:
  • Dimensional accuracy
  • Consistency with specifications and drawings
  • Consistency with the plans of other tradesmen
  • Scheduling impact
  • Conformance with subcontract obligations

A complete project documentation package inclusive of as-built drawings, warranties, and appropriate manuals will be furnished at project closeout.

Reliable and Automated Cost Control
Our interactive, on-line cost accounting system will facilitate accurate and efficient cost management by tracking actual and projected costs against line items in the original budget.

This job cost system also provides itemized listings of events with projected costs, and can generate a variety of reports on an as-needed basis, such as:

  • Job Cost Reports
  • Tradesman Status Report
  • Event Log
  • Accounts Payable Report
  • Certified Payroll Reports/Davis Bacon Review

Top of page

 


600 Harvey Road Manchester, NH 03103
(603) 641-9455

© 2008-2010 Brookstone Builders, Inc.